Recycling Construction Waste
As described in September’s blog, Solera is working hard to recycle as much construction waste generated on the project as possible. This requires us to separate all waste into individual bins for weighing and then removal to local recycling plants. In this picture our construction team is emptying wood into a wood-specific bin located on our construction yard.
0 comments:
Post a Comment